Trailtalk

Western Australia's premier trails social network

Allanson Collie duel use trail finished

2nd stage of the Collie to Allanson duel use path is complete and in full swing.

Finally connecting Collie to Allanson with a continuous path through the old growth Sheoak forest. if your new in town and looking for a quick spin, check it out, you wont be disappointed with the ride. Connecting riders with nature and communities is a great way to see the sights. Allinson town site, or cool down with a Black diamond swimming experience or just a great spin ride. It wont disappoint as a trails destination.

Views: 50

Comment

You need to be a member of Trailtalk to add comments!

Join Trailtalk

© 2018   Created by Trailtalk.   Powered by

Badges  |  Report an Issue  |  Terms of Service